Tag Archives: api separator bearings

Prepping Your Metal Parts

Prepare your pump parts for an upgrade to DuPont™ Vespel CR-6100

Review on Pump Parts and upgrading to Vespel CR-6100

The National Geographic Channel used to run a show called Doomsday Preppers where survivalist families would prepare for apocalyptic disasters and societal collapse. Although that sounds like a lot of fun, at Boulden, we are more concerned with helping your pumps survive adverse process conditions with an upgrade to DuPont™ Vespel® CR-6100.

 

Last month, we outlined the measurements required for a Vespel® CR-6100 installation. When you have decided to go forward with the upgrade, the first step will be to prepare the metal parts to facilitate the installation.

 

Start with a Little Chamfer

Vespel® CR-6100 is used for stationary wear components–throttle bushings, case wear rings, center-stage bushings, inter-stage case rings, vertical pump shaft bearings, throat bushings, agitator bearings, API separator bearings-basically any product lubricated wear part.

 

The material is installed with a significant press fit. To facilitate the press fit operation, the metal bore into which you will be pressing the Vespel® CR-6100 requires a small chamfer or radius (Figure 1). It is very important that any corners or sharp edges are fully broken and smoothed with a stone so that the metal edge does not remove material from the outside surface of the Vespel® CR-6100 during the press operation.

Figure 1: Chamfer or Radius Leading Edge to facilitate press fit. (Note shoulder on low-pressure side.)

 

 

 

 

 

 

 

 

 

Make Sure There is a “Shoulder” or “Step”

For any part exposed to differential pressure, it is important that the design features a shoulder or step at the low-pressure end (shown on the right side of Figure 1) to ensure the differential pressure does not dislodge the Vespel® CR-6100 during operation.

 

Some radially split multi-stage pumps (BB4 and BB5) pumps feature metal wear rings welded into the pump diffusers with no step or shoulder incorporated in the design. In this case, you can consider modifying the diffusers so that the case wear rings have an “L” shaped profile like the rings below which were used in a hydrocracker charge pump.

Figure 2: “L” Shaped wear ring profile for BB4 or BB5 pump type.

 

Conclusions

Vespel® CR-6100 can help you avoid pump seizure during extreme events like running dry. The temperature limit is 500 F (260 C), allowing it to survive infernal heat waves. The material is not affected by electromagnetic pulses. polar shifts, or solar flares. As an added bonus, Vespel® CR-6100 has an indefinite shelf life, making it an ideal material to stockpile in your underground bunker, and the material is likely to hold its value in the case of hyperinflation.

 

In reality, you don’t have to stockpile the material. Boulden carries a huge inventory of stock sizes in the USA, Europe, and Singapore. You can generally receive whatever material you need in a matter of days.

 

To prepare your pump for whatever the future holds, please contact Boulden with your application details and dimensions. We’ll be happy to walk you through the installation details–assuming we have not been wiped out by an asteroid strike.

Todays Photo

All this talk of disaster is making me hungry. This is some excellent Bun Cha in Vietnam.

 

 

Helpful Links:

Standard Stock Sizes of Vespel® CR-6100

Vespel® CR-6100 Product Data Sheet

Vespel® CR-6100 Machining Guide

3MW Boiler Feed Pump Case Study

If you need any material or have any questions. Please contact us today. Until next time.

Contact Us Today To Learn More About Vespel and Boulden Company!

 

 

Upgrading Pumps With Composite Wear Components Part: 3

boulden1

Part 3: Reduce Clearance–Improve Pump Efficiency

Welcome to Part 3 in our series on upgrading pumps with composite wear parts.

In the first part of this series, we discussed how upgrading your pumps with composite wear parts can help avoid galling and seizing. Because composite parts do not gall or seize like metal parts, this allows you to reduce the clearance at these components in your pump.

In Part 2, we discussed how reducing the clearance at the wear rings, throttle bushings, and center-stage bushings creates a stabilizing force in your pump called The Lomakin Effect. This force helps to reduce vibration and shaft deflection, leading to longer seal and bearing life in your pumps.

Today, we will discuss how reducing the clearance in your pump also improves pump efficiency.

Background

According to a major centrifugal pump OEM, energy consumption accounts for 44% of the life cycle cost of a centrifugal pump. You can reduce this cost by upgrading the wear components to a composite material like Vespel® CR-6100 and reducing the clearance in your pump.

The specific components where you want to reduce the clearance are the pump wear rings, inter-stage rings, center-stage bushing, and throttle bushing. These components form the barriers between high-pressure and low-pressure areas within the pump. The differential pressure across these components creates internal recirculation within the pump, resulting in a loss of pump efficiency (Figure 1).

 

Leakage wear rings

Leakage past the wear rings (QL) creates efficiency loss

 

 

 

 

 

 

Which Pumps Produce the Biggest Gains?
When you upgrade these components to Vespel® CR-6100, you can typically reduce the clearance by 50% compared to the API minimum for metal parts. If you reduce the clearance by 50%, you reduce the internal recirculation by approximately 50%, leading to a significant efficiency gain.

If we consider only efficiency gains, horizontal multi-stage pumps usually offer the best return on investment from an upgrade to Vespel® CR-6100 with reduced clearance. These pumps have multiple leak paths across wear rings, inter-stage rings, center bushings, and throttle bushings. Because they have many stages, these pumps also tend to consume a lot of power. Consider the following cases where process plants have reduced the operating costs of their multi-stage horizontal pumps:

  • A power station upgraded a 3MW boiler feed water pump with Vespel® CR-6100 along with the Boulden PERF-Seal™ design and reduced clearance and recorded a 7% efficiency gain compared to a newly rebuilt pump with original clearances.
  • A refinery upgraded their hydrocracker charge pumps with Vespel® CR-6100 along with the Boulden PERF-Seal™ design and reduced clearance and recorded 4% more through put to their hydrocracker-a hugely profitable upgrade.
  • A product pipeline company upgraded their LPG shipping pumps with Vespel® CR-6100 and reduced clearance, resulting in a 4% efficiency gain.

Another area to consider is process pumps which are marginally undersized, requiring parallel pump operation to achieve 100% of the target process rate. Sometimes, a modification as simple as reducing the wear ring clearance can get you back to one-pump operation with a full-capacity spare pump.

The PERF-Seal™

To further increase the efficiency gain associated with reduced clearance, the components can be modified with the Boulden PERF-Seal™ design. Internal testing has shown that the PERF-Seal™ creates an additional reduction in flow across throttle bushings, center-stage bushings, and wear rings beyond what can be achieved with reduced clearance alone.

Conclusion

When you eliminate the metal-to-metal contact surfaces in your pumps and use Vespel® CR-6100 stationary wear components, you can then reduce the clearance. This reduction in clearance improves pump efficiency and lowers the operating cost of the pump. Numerous field examples exist where customers have saved tens of thousands of dollars on their annual pump operating costs with this simple upgrade.

If you have a pump where improved efficiency will save you money, contact Boulden today. We have a huge inventory of Vespel® CR-6100 standard sizes in stock ready for immediate shipment almost anywhere in the world.

For application and installation details, download the Boulden Installation Guide for Vespel® CR-6100

Camps Bay Beach in Cape Town, South Africa

Camps Bay Beach in Cape Town, South Africa

 

Boulden Company

Boulden Company

Boulden Company

Conshohocken, PA, USA

1-610-825-1515

Boulden International, S.ar.L

Ellange, Luxembourg

+352 26 39 33 99